Delivery Date Calculator for CNC Job Shops

Before you tell a customer a date, check it. Answer five questions, enter the working days each part of the job will take, and get the earliest date you can safely promise, compared with the date your customer asks for. Print it or save it as a PDF for the job file. Everything runs in your browser: nothing you type is sent to us.

Why dates get missed, and how to fix it: How to Improve On-Time Delivery in a CNC Job Shop.

Start here: the job

Saved in this browser as you type, so a refresh loses nothing. Never sent to us.

Today, unless the job can only be released later.

Step 1: Five questions

0 of 5 answered

Any "No" means the date is not ready to promise yet. You will see what to fix.

1. Is everything for this job in hand, or dated?
What counts?

Material, drawing at the right revision, programme, tools and fixtures, gauges. Anything missing needs a date beside it.

2. Do we know how much work is already ahead of it on the machine that limits us?
What counts?

Look at the queue on the busiest machine (the bottleneck), not on the one that is free.

3. Does the date include outside work and inspection?
What counts?

Heat treatment, plating, grinding, transport, first-piece approval, final inspection and packing.

4. Is there a buffer for the unexpected?
What counts?

Breakdowns, rework, a hot job from another customer.

5. Does one named person own this date?
What counts?

Someone who will see on day 2 that it is slipping and tell the customer before the due date.

Step 2: Build the date, in working days

Use whole or half days. Leave a part empty if it does not apply.

The queue on your bottleneck machine, plus anything missing for the job.

days

Setup and run time for the whole quantity, every operation.

days

Heat treatment, plating, grinding, going and coming back.

days

First piece, final inspection, packing, the truck.

days

A share of the total above. 10 to 20% is a sensible start.

%

Step 3: Your working week

Pick how many days your floor runs, then adjust single days if needed. Monday to Saturday is set to start with.

These days, and your weekly off, are skipped when the date is counted. Your week, buffer and holidays are remembered in this browser, also after Start fresh.

Optional: for the printout

Done with this job? Clear the entries (your week, buffer and holidays stay).

Your result

Fill in the days for at least one part of the job, and the result appears here.

How the date is worked out

Total working days = waiting + machining + outside work + inspection and dispatch, plus the buffer, rounded up to a whole day. The earliest safe date is that many working days after the day you count from, skipping your weekly off and the holidays you add.

The comparison

If the customer's date is on or after the earliest safe date, it is safe to promise. If it falls after the work would finish but before the buffer runs out, it is tight. If it is earlier than that, the tool says how many working days short it is.

The five questions

The things that make a date wrong before anyone starts: a job that is not ready, a queue nobody looked at, outside work left out, no buffer, and no owner. If any answer is No, the tool tells you to confirm first and shows what to fix.

What it cannot know

It uses the numbers you give it. If the queue in front of your bottleneck is a guess, so is the date. The tool makes the guess visible; it does not replace looking at the floor.

Prefer paper? Download the one-page PDF to fill in by hand and put on the job card. For the reasons dates get missed, read How to Improve On-Time Delivery in a CNC Job Shop.

Common questions

How do I decide what delivery date to promise a customer?

Add up the wait before the job can start (the queue on the machine that limits you), the machining time, outside work and transport, and inspection and packing. Add a buffer of roughly 10 to 20 per cent. That total, counted in working days from today, is the earliest date you can safely promise. If you can't work it out on the call, say you will confirm by a fixed time, and then do.

Why are my CNC deliveries always late?

Usually not because of machine capacity. The common causes are a date promised without checking what is already waiting on the busiest machine, jobs that start before material, drawings or tools are ready, priorities changed mid-shift by hot jobs, and nobody seeing a slipping job until it is due. How to Improve On-Time Delivery in a CNC Job Shop.

How much buffer should I add to a delivery date?

Ten to twenty per cent of the total working days is a sensible start for a job shop, because breakdowns, rework and hot jobs from other customers will happen. Start at 15 per cent. Look at your last ten jobs: if most shipped late even with this, raise it; if most shipped early, lower it a little.

What counts as a working day?

The days your floor actually runs. This tool starts with Monday to Saturday. Change the week if you work five or seven days, and add the holidays and shutdowns that fall inside the period. The date is counted from the day you choose, and that day itself is not counted.

Is anything I type saved or sent to you?

No. The calculation runs in your browser. We only count that the tool was used: that a result was shown, printed or shared, with no names, numbers or job details. What you enter is kept in your own browser only, so a refresh or a closed browser doesn't lose your work; when you come back you can open it or start fresh, and Start fresh clears it. On a shared computer, press Start fresh when you finish.

More free tools

All free tools →

Still missing dates you promised?

A date check helps for one job. On a free 90-minute floor walk we look at why dates are lost across the whole shop: how jobs are released, where they wait, and who owns each date.

Book a free floor walk
Book a free floor walk
expand_less